The Vitimsky Hydroelectric Power Plant (HPP) Cascade is a proposed group of hydropower plants on the Vitim River in the Buryatia and Irkutsk regions of Russia. The first stage consists of the proposed Mokskaya HPP, with a planned capacity of 1,200 MW, and an average annual production of c. 4.54 billion kWh.〔http://www.hydroworld.com/articles/2007/09/russian-joint-venture-to-include-1410-mw-mokskaya-complex.html〕 The second stage consists of the projected Ivanovo HPP, with a planned capacity of 210 MW, and an average annual production of c. 1.03 billion kWh. The third stage: the projected Yangudinskaya HPP, with a planned capacity of 360 MW. The fourth stage: the projected Karalonskaya HPP, with a planned capacity of 450 MW. The fifth stage: the projected Signayskaya HPP, with a planned capacity of 590 MW. The sixth stage: the projected Bodaibo HPP, with a planned capacity of 600 MW. ==References== 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Vitimsky HPP Cascade」の詳細全文を読む スポンサード リンク
|